Industrialist Paper No. 3

Industrialist Paper No. 3

Local Optimization Creates National Failure

A nation that cannot make essential goods is not sovereign. It is exposed.

Domestic manufacturing is a prerequisite for national security and for a healthy middle class. In a crisis, the limiting factor is rarely courage, it is throughput. Eisenhower famously said that battles, campaigns, and even wars have been won or lost primarily because of logistics, and Pershing is often quoted as saying, “Infantry wins battles. Logistics wins wars.”

By now you have the frame. Paper 1 argued that manufacturing breaks when meaning does not survive the handoff: the drawing, the model, the note block. Paper 2 argued that the factory is not a building, it is a network: the work package has to route across shops, processes, and schedules. Paper 3 is about the next failure mode, and it is human behavior across the RFQ and the purchase order.

This failure mode shows up in machining, but also in textiles, furniture, wiring harnesses, PCBs, castings, molding, and final assembly, anywhere a work package has to survive handoffs.

The system underperforms because everyone is behaving rationally inside their local incentive box.

The buyer is trying to avoid a quality escape, a late ship date, a compliance failure, and a career ending incident report attached to a part number. The shop is trying to avoid scrap, chargebacks, rework, unpaid engineering time, and a schedule hole that idles a spindle, a press, or an assembly line. Each side tightens its local rules around the RFQ and the PO. The aggregate outcome is predictable: longer lead times, fewer experiments, fewer new suppliers, and more routing to incumbents, brokers, or offshore capacity.

If the 1950s and 1960s had continued on their trajectory, this would have self-corrected. The reason this does not self correct is the escape valve. When a work package is unclear, when qualification is slow, when the supplier list is thin, the buyer can export the mess. Drop the RFQ into an offshore channel. Accept the cheapest price. Let a foreign factory take whatever is thrown over the wall. The buyer gets a part number moving again, and the domestic network never feels enough pressure to fix the routing layer. This is why domestic sourcing can feel painful and offshoring can feel so easy… Local optimization has become optimization to exit the domestic network. Spoiler alert; it doesn’t have to be this way. But first let’s explore in detail what’s happening. 

Pain placement

A work package has ambiguity. A drawing has missing datums. A finish callout implies an inspection method. A material cert chain is unclear. A BOM conflicts with a model revision. Somebody will pay for that ambiguity in a traveler, a router, a test plan, or a rework ticket.

In a healthy domestic network, ambiguity is confronted early, priced explicitly, clarified quickly, and converted into stable work instructions that production and inspection can execute without interpretation on the shop floor.

In the current network, ambiguity is often treated like toxic waste attached to a CAD file. It gets pushed downstream to the cheapest place that will accept it. That is the escape valve. It does not remove the waste from the drawing. It relocates the waste into scrap, rework, expediting, and fragile supplier dependency.

The accounting fiction is that the buyer “saved money” on the purchase order. The manufacturing reality is that the cost reappears later as scrap, rework, expedited freight, delayed assemblies, and brittle dependence on a supplier chain the buyer cannot audit.

A system that routinely exports ambiguity trains itself to keep producing ambiguity in the RFQ packet.

How the escape valve changes buyer behavior

Inside a purchasing team, most incentives are tied to visible events: award dates, quoted lead time, and whether the part arrived “on time” into receiving. The dashboard rarely shows the hidden cost of a weak work package. It rarely shows the engineer hours spent clarifying a tolerance. It rarely shows the downstream cost of yield loss during assembly. It rarely shows the cost of a late change order on a PCB stackup.

So buyers add gates, then exit anyway through an offshore quote.

After a quality escape on a bracket, a harness, or a molded housing, the buyer adds documentation to the next RFQ: first article forms, calibration records, inspection formats, cert requirements, and portal fields. That feels like risk reduction inside procurement. Then the buyer realizes that onboarding takes weeks and quoting takes days, so they also send the same RFQ to an offshore channel that returns a price in minutes.

Now the buyer is doing both at once. More paperwork for domestic suppliers, and more offshoring when the schedule tightens around a ship date.

That combination poisons the domestic chain. It raises the cost of being domestic while preserving the option to exit at the first sign of friction in the work package.

How the escape valve changes shop behavior

A shop lives on the shop floor, where a setup has real constraints: fixtures, tooling, metrology capacity, operator attention, material availability, and schedule windows. Quoting is unpaid engineering work, whether it is CAM time, a sewing pattern, a mold flow assumption, or a test fixture estimate.

When buyers keep exporting messy work packages instead of cleaning them, a shop sees a pattern in the RFQ inbox. The stream becomes noisy, incomplete, and adversarial. The shop responds rationally:

  • Ignore RFQs that smell like fishing, ambiguity, or churn tied to a purchase order.
  • Quote high when the tolerance stack, datum scheme, or test plan is unclear on the drawing.
  • Quote slow because triage consumes estimator time and process planning time.
  • Favor known customers where revision control and inspection expectations are stable in the router.
  • Decline work when the inspection plan cannot be inferred safely from the work package.

The escape valve makes this behavior more rational, not less, because the clean work package gets routed privately to incumbents, and the messy work package gets broadcast. Over time, the broadcast channel becomes a junk channel. The best operators, programmers, and production planners stop listening.

That is how a nation can have world class machines, presses, looms, and pick and place lines, and still “feel” like it has no capacity for the part families that matter.

Deadweight accumulates inside the domestic network

Once the escape valve exists, the domestic network begins carrying deadweight that does not show up on a balance sheet, but does show up in lead time and production risk.

Every buyer rebuilds supplier knowledge from scratch for the same manufacturing process. Every shop re-litigates the same uncertainty on every RFQ. Every engineering team rewrites the same clarifications into the same email chain. Every quality team invents a private onboarding checklist for the same cert. Every procurement team maintains a private spreadsheet that dies when a manager leaves a program.

Those are coordination costs paid in calendar time and human attention, and they attach directly to the work package.

Deadweight compounds. The more coordination overhead exists, the more attractive the escape valve becomes. The more the escape valve is used, the less pressure there is to remove domestic overhead. The loop tightens around the purchase order.

It produces a national illusion: “We cannot build here fast.” The domestic network is paying a tax that the offshore route temporarily dodges by accepting ambiguity and deferring consequences into rework, warranty, and replacement orders. Offshore suppliers price that ambiguity because labor and overhead are cheaper, and because the buyer’s dashboard is scored on award date and ship date, not on yield loss, incoming inspection fallout, fixture rework, or line stoppages during integration.

The offshore escape valve, and what should replace it

Instant quoting can be excellent when it is bounded, domestic, and honest about constraints in the work package. If the drawing is clear, the process family is known, inspection expectations are explicit, and supplier identity is verified, an instant quote is simply a fast routing decision. That is coordination working.

The core problem is the offshore escape valve: the ability to export urgency and ambiguity out of the domestic network whenever the internal system becomes slow, noisy, or bureaucratic. That valve does not fix the drawing. It postpones clarification, relocates risk, and turns the long tail of consequences into somebody else’s problem.

This is why the loop persists. When the schedule tightens, the buyer does what any rational person does: choose the path that keeps the program alive and the part number moving. Offshoring becomes a relief mechanism. It solves near term pain, then introduces longer term costs that rarely land on the same dashboard: IP exposure, hidden rework, supplier dependency, warranty risk, and the slow atrophy of domestic capability in the exact process steps the buyer needs later.

No procurement team will carry those national costs on its own. The solution is domestic systems that behave similarly on speed and certainty, while preserving domestic benefits: enforceable contracts, verifiable identity, controlled technical data handling, and accountability when a part fails inspection.

In other words, no matter what we think about the offshore escape valve, it simply raises the bar on what is required from domestic sourcing. Fortunately, modern software systems applied to manufacturing and treating the factory as a network can out-perform the escape valve in both near-term needs and long-term outcomes. The goal is faster domestic routing built on better infrastructure, not slower sourcing dressed up as virtue.

Local optimization becomes national fragility

Local optimization makes sense in isolation. A buyer under schedule pressure routes to the fastest path. A shop under load quotes only what it can execute safely with its tooling and inspection plan. Each decision is defensible inside a single purchase order.

The global outcome is fragility across the supplier network. Fewer domestic suppliers get trial work, which means fewer shops stay willing to take high mix, low volume work, which compounds the perception of scarcity in capacity. Less domestic process knowledge gets exercised on real parts. Fewer fixtures, test jigs, and inspection routines get built. Less metrology capacity gets purchased. The domestic base becomes less practiced at the part families that matter under shock.

Then the next crisis arrives, and the nation discovers that “capacity” is not just a machine tool, a press, or an SMT line. Capacity is a practiced network: suppliers who know how to execute, buyers who know how to communicate, and protocols that move a work package without losing meaning.

The escape valve quietly weakens all three, one RFQ at a time.

A better optimization function

If the buyer’s objective function is “get a quote now,” the escape valve wins. Every time a portal is slow, every time onboarding drags, every time a supplier asks for clarification, the offshore channel looks like relief.

If the buyer’s objective function is “deliver conforming parts with reliable lead time and bounded risk,” the optimization changes. Speed still matters to a ship date, but speed has to compound with clarity, verification, and consequence. The fastest path becomes the path that makes work packages legible and routable inside the domestic network, without resetting qualification on every program.

That requires three upgrades to the domestic coordination layer.

#1 - Make the work package a first class object. A drawing, a model file, cert requirements, finish requirements, inspection expectations, and revision control have to travel together as a coherent unit. That unit needs structure that can survive an email, a portal, and a handoff into production work instructions. This must be handled in the network itself, not through a new set of standards or protocols. Translation > Language change. 

#2 - Make trust portable and consequence driven. Responsiveness, on time delivery, dispute rate, and quality outcomes must attach to a verified supplier identity. A shop that answers quickly and ships conforming lots should become easier to route to than a shop that vanishes. A buyer that sends clear packages and closes the loop should get better supplier attention than a buyer that spams RFQs and never awards.

#3 - Measure the right costs. Latency, ambiguity, and qualification resets are real costs that attach directly to the RFQ packet, the router, and the inspection plan. They must become visible in the dashboard. When those costs are visible, the incentives shift in the right direction and apples-to-apples comparisons are possible. 

Incentives and measurement drive allocation. Visibility governs where the work goes. Throughput depends on coordination as much as it depends on labor and energy, because coordination decides whether labor and energy convert into finished parts and shipped assemblies.

Implications

  • The offshore escape valve explains why coordination failures persist: the system can export ambiguity in a drawing instead of correcting it.
  • Under pressure, local optimization often means exiting the domestic supplier network, which trains the domestic RFQ channel to stay noisy.
  • Deadweight accumulates as repeated qualification, repeated clarification, and repeated defensive quoting, all paid in calendar time and engineer attention tied to a work package.
  • Race to the bottom offshore routing amplifies the loop by rewarding speed and price while deferring manufacturing consequences into rework and dependency.
  • The way out is a better optimization function: a network that can structure work packages, portable trust signals with consequences, and visibility into latency and ambiguity costs. Domestic instant quoting, grounded in verified capability and explicit constraints, are part of the solution for repeatable work.

Next: Paper 4, The Latency Tax, how time to clarity and time to quote decide winners, and why coordination speed beats theoretical low cost in real manufacturing work.

Subscribe to Industrialist

Don’t miss out on the latest issues. Sign up now to get access to the library of members-only issues.
jamie@example.com
Subscribe